Skip to content
Riverside Concrete Cutting
Core drilling rig set up on the footpath at Goulburn Valley Grammar School

Core drilling

Goulburn Valley Grammar School

Another productive day in Shepparton, with Riverside Concrete Cutting completing specialised core drilling works at Goulburn Valley Grammar School for upcoming bollard installations.

Location
Shepparton, Victoria

Our team completed 19 x 280mm diameter core holes, providing accurate openings ready for the installation works.

Coring & Spoil Removal – One Complete Solution

Rather than allowing slurry and spoil from the coring process to build up around the work area, we deployed our Hydro Excavation Unit alongside the core drilling operation.

As each hole was completed, the unit was used to remove the resulting spoil and slurry, helping maintain a cleaner, safer and more efficient work area throughout the project.

Having our own specialised equipment on site allows RCC to provide more than just the concrete cutting itself. We can manage the associated slurry, spoil and clean-up requirements while keeping the job moving.

RCC has the specialised equipment and experience to tackle challenging projects throughout regional Victoria.

  • 19 x 280mm Core Holes ✔
  • Hydro Excavation ✔
  • Clean & Efficient Worksite ✔

No Job Too Tough. 💪

Core holes
19 x 280mm
For
Bollard installation
Spoil
Hydro excavation unit

Got one like this?

Send through the thickness, the opening size and the access and you will get a price back.

0427 158 583

More projects

  • Completed access ramp with galvanised handrails at a Victorian school entrance

    Accessibility upgrades

    VSBA Accessibility Upgrade Works

    For Victorian School Building Authority

  • Wall saw running along the pool hob on a custom sliding frame at St Arnaud Pool

    Wall sawing

    Pool Refurbishment & Remediation

    For Jarryd Ezard Construction