Expansion Joint CuttingEchuca

Cut while the slab is still green, before the concrete decides for itself where it is going to crack.

Concrete cracks. Joints decide where

Every slab shrinks as it cures and every slab cracks. A control joint is a weakened line that gives the crack somewhere sensible to go, so it happens under a straight saw cut instead of wandering across the middle of a new floor.

Timing is the whole trick. Cut too early and the aggregate ravels along the edge. Cut too late and the slab has already cracked wherever it felt like. We run a Soff-Cut Ultra early entry system, which dry cuts in the green zone within a couple of hours of the finish, long before a conventional wet saw could touch it.

It is a dry cut with an anti ravel skid plate, so there is no slurry running across a slab that is still curing. On a big pour we work in with the concreters and stay until the joints are in, which regularly means finishing well after dark.

What turns up

System
Soff-Cut Ultra
Timing
Early entry, green zone
Method
Dry cut, no slurry
Edge
Anti ravel skid plate
Works with
The pour, on the night
Availability
24/7, 365

The pours that need joints on time

Anything large, anything visible, and anything that will carry a floor covering later. Which is most of what gets poured.

  • Shed and factory floors

    Large area pours where uncontrolled cracking ruins both the look of the floor and the way it wears.

  • Dairy and farm slabs

    Yards, feed pads and machinery slabs that live outside, move with the temperature and get washed down every day.

  • Carparks and hardstand

    External slabs that shrink and move with the weather, and need joints set out to a proper grid rather than guessed at.

  • Driveways and paths

    Residential and commercial flatwork, where a random crack across the front of a new house is the first thing every visitor sees.

  • Slabs to be polished

    Floors heading for a polished or exposed finish, where a shrinkage crack cannot be hidden under anything at all.

  • Retrofit and re cuts

    Cutting joints into cured slabs that never got any, and widening or cleaning out failed joints so they can be sealed properly.

Soff-Cut early entry saw running a dry control joint across a green concrete slab

Expansion joint cutting Echuca concreters book around the pour

This is the one service where the concrete sets the timetable, not the diary. Joints have to go in while the slab is green, so an Echuca booking is made against a pour date rather than a day of the week, and it regularly runs into the evening.

Because we are coming across from Bendigo, that booking gets locked in early. Tell us the pour date as soon as your concreter has it and the truck is planned around it. The one thing that does not work is a phone call at four in the afternoon on the day, because by the time anybody could get there the window has closed.

Soff-Cut Ultra is what makes early entry possible. It dry cuts within a couple of hours of the finish, and the skid plate holds the surface together at the blade so the edge does not ravel. Get the timing wrong and the slab tells everyone about it, permanently.

Often on the same job

Expansion Joint Cutting across the region

Bendigo is the base, but the truck is on the road most days. Same gear, same crew, same hours, right across central Victoria and southern New South Wales.

What Echuca customers say

4.9 out of 5From 18 Google reviews
  • Fast and efficient nothing is ever a dramma no matter the complexity of the job
    Jack HealeyGoogle review
  • Highly professional, efficient, and cost-effective service. The whole process is always handled smoothly and professionally from start to finish. Would highly recommend.
    Connor MaymanGoogle review
  • Reliable, honest with knowledge and experience, accompanied with the correct machinery for each of the projects and,
    Paul GrechGoogle review
  • Darren and his team were communicative, honest, and professional. Cannot ask for more than that. We were very appreciative of their work.
    Terry DoddsGoogle review

Asked often

When should control joints be cut?

As soon as the slab will hold an edge, which with an early entry system is usually within a couple of hours of finishing. Waiting until the next morning is how slabs end up cracked before anybody has cut a joint into them.

What is early entry cutting?

A dry cut system, in our case Soff-Cut Ultra, built to cut while the concrete is still green. A skid plate supports the surface at the blade so the edge does not ravel, which is what stops a conventional saw going in that early.

How far ahead should I book for an Echuca pour?

As soon as your concreter gives you a date. The window on a green slab is a couple of hours, so it is planned into the run rather than squeezed in on the day. Late notice is worth a call anyway, because we may already be in town.

How deep do the joints go?

Deep enough to create the weakened plane the slab will crack along, set against the slab thickness. We cut to the engineer or the specification where there is one and to standard practice where there is not.

Will it make a mess of a fresh slab?

No. It is a dry cut, so there is no slurry washing across a floor that is still curing. That is a big part of why early entry is used on slabs heading for a polished or exposed finish.

Can you cut joints into an existing slab?

Yes, though it is a different job. On a cured slab we use the floor saw rather than the early entry machine. It works, but it will not undo cracking that has already happened.

When is the pour

Give us the pour date, the area and the joint layout if you have one. Early entry work gets booked around your concreter, including overnight.